On July 23, 2026, the Division of Building and Facilities, University of Phayao, led by Mr. Nattawut Somyarone, Assistant to the President, together with personnel of the Division of Building and Facilities, conducted an on-site inspection of the installation of 17 air conditioning units at the PKY academic building, in rooms C101, C102, C201, C202, C203, C301, and C302. The inspection aimed to verify the completeness of the installation, ensure compliance with specifications, and assess the system's readiness prior to operation.
This site visit focused on a detailed examination of the work at each location, covering the appropriateness of installation positions, the completeness of equipment, and the efficiency of the system. The goal was to ensure that the air conditioning units function effectively, adequately supporting teaching, learning, and various activities within the building.
This site visit focused on a detailed examination of the work at each location, covering the appropriateness of installation positions, the completeness of equipment, and the efficiency of the system. The goal was to ensure that the air conditioning units function effectively and adequately support teaching, learning, and various activities within the building.